Invest Daily Pro
  • Economy
  • Investing
No Result
View All Result
  • Economy
  • Investing
No Result
View All Result
Invest Daily Pro
No Result
View All Result
Home Top News

Terra Solar seeks ERC nod for connection facility

by
December 11, 2024
in Top News
0
Terra Solar seeks ERC nod for connection facility
0
SHARES
2
VIEWS
Share on FacebookShare on Twitter
PHILSTAR FILE PHOTO

SOLAR DEVELOPER Terra Solar Philippines, Inc. (TSPI) is seeking approval from the Energy Regulatory Commission (ERC) to establish a transmission facility for its P200-billion solar power and battery energy storage project.

TSPI aims to develop, own, and/or operate dedicated point-to-point limited transmission facilities to connect its power project to the Luzon grid, according to its filing with the ERC.

“Connecting the Terra Solar Project to the Luzon grid via bus-in connection along the Nagsaag-San Jose 500-kilovolt (kV) Transmission Line is an essential requisite to the plant’s commercial operations scheduled in the first quarter of 2026,” the company said.

The company is constructing a 3,500-megawatt-peak (MWp) solar power plant and a 4,500-megawatt-hour (MWh) battery energy storage facility in Central Luzon.

Now known as MTerra Solar, the project is targeted to be completed by 2027 and is expected to provide clean energy to more than two million households.

“After a thorough review of the available options, TSPI determined that the bus-in connection along the Nagsaag-San Jose 500-kV Transmission Line is the most cost-effective and technically viable option for the immediate interconnection of the Terra Solar Project,” the company said.

Once completed, the operation, service, and maintenance of the said facilities are proposed to be undertaken by the National Grid Corp. of the Philippines, consistent with the decision of the commission on similar applications, it said.

MGen Renewable Energy, Inc., the renewable energy arm of Meralco PowerGen Corp. (MGen), holds a controlling stake in SP New Energy Corp. MGen is a subsidiary of power distributor Manila Electric Co. (Meralco).

Last month, the companies officially broke ground for the MTerra Solar Project, marking the full swing of its construction.

TSPI tapped state-owned firms China Energy Engineering Group Co., Ltd. and Power Construction Corp. of China Ltd. for the construction of the project.

The company also inked a contract with Meralco Industrial Engineering Services Corp. to design and construct critical infrastructure that will connect the solar plant to the Luzon grid.

The total contract price amounts to P7.8 billion, while about $116.9 million (approximately P6.8 billion) was allocated for offshore equipment.

The MTerra Solar project is set to deliver electricity under a 20-year, 850-MW mid-merit power supply agreement to Meralco.

Meralco’s controlling stakeholder, Beacon Electric Asset Holdings, Inc., is partly owned by PLDT Inc.

Hastings Holdings, Inc., a unit of PLDT Beneficial Trust Fund subsidiary MediaQuest Holdings, Inc., has an interest in BusinessWorld through the Philippine Star Group, which it controls. — Sheldeen Joy Talavera

ShareTweetPin

Related Posts

Have a taste of the perfect day in paradise with SULÀ Spirits
Top News

Have a taste of the perfect day in paradise with SULÀ Spirits

January 8, 2025
First months of 2025 likely rainy amid La Niña conditions, says PAGASA
Top News

First months of 2025 likely rainy amid La Niña conditions, says PAGASA

January 8, 2025
December inflation rises to 2.9%
Top News

December inflation rises to 2.9%

January 7, 2025
Outstanding debt hits fresh high of P16.09T
Top News

Outstanding debt hits fresh high of P16.09T

January 7, 2025
Outstanding debt hits fresh high of P16.09T
Top News

Outstanding debt hits fresh high of P16.09T

January 7, 2025
PHL end-December dollar reserves drop to $106.8B
Top News

PHL end-December dollar reserves drop to $106.8B

January 7, 2025
Next Post
Central bank launches second phase of SME credit risk database project

Central bank launches second phase of SME credit risk database project

Recommended

The Benefits of Implementing Proposal Management Software in Your Business

The Benefits of Implementing Proposal Management Software in Your Business

September 8, 2024
Nomura sees slower PHL growth

Nomura sees slower PHL growth

December 4, 2024
Philippines is still most disaster-prone country for 16th straight year

Philippines is still most disaster-prone country for 16th straight year

September 9, 2024
Freshdesk vs Zendesk: AI-Powered Customer Service Solutions for Small Businesses and Enterprises

Freshdesk vs Zendesk: AI-Powered Customer Service Solutions for Small Businesses and Enterprises

November 26, 2024
PBCom raises P7.7 billion from maiden offering of peso bonds

PBCom raises P7.7 billion from maiden offering of peso bonds

November 5, 2024
Secrets to content creation unveiled in YGG Play Summit 2024

Secrets to content creation unveiled in YGG Play Summit 2024

December 1, 2024

    Stay updated with the latest news, exclusive offers, and special promotions. Sign up now and be the first to know! As a member, you'll receive curated content, insider tips, and invitations to exclusive events. Don't miss out on being part of something special.


    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    • About us
    • Contact us
    • Privacy Policy
    • Terms & Conditions

    Copyright © 2025 InvestDailyPro. All Rights Reserved.

    Disclaimer: InvestDailyPro.com, its managers, its employees, and assigns (collectively InvestDailyPro ) do not make any guarantee or warranty about what is advertised above. Information provided by this website is for research purposes only and should not be considered as personalized financial advice.
    The Company is not affiliated with, nor does it receive compensation from, any specific security. The Company is not registered or licensed by any governing body in any jurisdiction to give investing advice or provide investment recommendation. Any investments recommended here should be taken into consideration only after consulting with your investment advisor and after reviewing the prospectus or financial statements of the company.

    No Result
    View All Result
    • About us
    • Contact us
    • Home
    • Privacy Policy
    • Suspicious engagement
    • Terms & Conditions
    • Terms & Conditions
    • Thank you

    Copyright © 2024 investdailypro.com | All Rights Reserved